E39 series BMW 5

since 1996-2001 of release

Repair and car operation



E39 BMW
+ Introduction
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Systems of cooling, heating
- Power supply system and release
   - Power supply system
      Economy of fuel at movement
      Rules of observance of purity at work with fuel system
      Check of the relay of the fuel pump
      Check of productivity of the fuel pump
      Removal and installation of the sensor of a reserve of fuel and fuel pump
      Removal and installation of the case of the air filter and measuring instrument of weight of air
   + System of injection of the petrol engine
   + Power supply system of the diesel engine
   + System of production of the fulfilled gases
+ engine Electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes
+ System of onboard diagnostics


Heavy Metal & Reflected



Removal and installation of the case of the air filter and measuring instrument of weight of air

 REMOVAL

1. Remove a measuring instrument of weight of air. For this purpose turn a makhovichok at the tip (3) to the left and remove. Open a collar in a point (1) at an air hose. Clips (2) open a screw-driver outside. Address to an accompanying illustration.

2. Unscrew a bolt (1) and pull the case of the air filter from a soaking-up branch pipe (2) and a rubber support (3) a little. Address to an accompanying illustration.

3. Unscrew bolts of fastening and remove an additional tank (arrows on an accompanying illustration) from a box of the air filter.

Installation

Air filter of models 520i, 523i, 528i:

1 — an additional tank
2 — a filter box
3 — a rubber support
4 — a soaking-up branch pipe
5 — a collar

6 — a clip
7 — a sealing ring
8 — a filtering element of the air filter
9 — a basic framework


 INSTALLATION

1. Fix an additional tank
2. Insert the case of the air filter with the bottom rubber support. Thus join soaking-up branch pipe at a body wing. Fix bolts.
3. Insert a measuring instrument of weight of air with a sealing ring and fix it a clip.
4. Put on an air hose of the inlet pipeline at a measuring instrument of weight of air and fix it collars.
5. Join shtekerny connection of a measuring instrument of weight of air and turn a makhovichok to the right.