E39 series BMW 5

since 1996-2001 of release

Repair and car operation



E39 BMW
+ Introduction
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Systems of cooling, heating
- Power supply system and release
   + Power supply system
   + System of injection of the petrol engine
   - Power supply system of the diesel engine
      Turbokompressor
      System of a retsirkulyatsiya of the fulfilled gases (EGR system)
      Device of heating of the fuel filter
      Air removal from fuel system
      Check, removal and installation of the fuel locking valve
      Removal and installation of nozzles
      Check and adjustment of the moment of the beginning of injection
      Removal and installation of the inlet pipeline
   + System of production of the fulfilled gases
+ engine Electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes
+ System of onboard diagnostics


Heavy Metal & Reflected



Check, removal and installation of the fuel locking valve

The electromagnetic fuel locking valve at TNVD opens supply of fuel at ignition inclusion. It is necessary for checking, if the engine is not started or after switching off of ignition does not stop.

 CHECK

1. Switch on and off the ignition lock on a steering wheel. The electromagnetic valve thus should click distinctly.
2. If click is not present, disconnect an electric wire. Put a cable of the storage battery to the valve of interruption of supply.
3. If now click is audible, check a chain. If necessary replace wires. If the source of malfunction is not found, replace the valve.
4. At work with fuel system observe purity, address to the Section of the Rule of observance of purity at work with fuel system.


 REMOVAL

Disconnect a cable and turn out the valve of interruption of supply (1). Address to an accompanying illustration.


 INSTALLATION

1. Remove the piston and a spring of the valve and insert them into other valve. Watch the correct provision of a sealing ring.
2. Screw the new valve and tighten it the moment of 20 Nanometers. Fix a cable.