E39 BMW
+ Introduction
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Systems of cooling, heating
- Power supply system and release
   + Power supply system
   + System of injection of the petrol engine
   - Power supply system of the diesel engine
      Turbokompressor
      System of a retsirkulyatsiya of the fulfilled gases (EGR system)
      Device of heating of the fuel filter
      Air removal from fuel system
      Check, removal and installation of the fuel locking valve
      Removal and installation of nozzles
      Check and adjustment of the moment of the beginning of injection
      Removal and installation of the inlet pipeline
   + System of production of the fulfilled gases
+ engine Electric equipment
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes
+ System of onboard diagnostics


Heavy Metal & Reflected



Removal and installation of the inlet pipeline

The inlet pipeline should act in film for ensuring access before work, for example, on fuel system.

REMOVAL

1. Remove covers of the engine and a pressurization pipe.

2. Disconnect a weight cable from the storage battery. The battery is in a luggage carrier behind the right lateral facing.

At a detachment of the battery the memories given in electronic blocks, for example, memories of malfunctions of the engine are erased. Address to recommendations of the Section Removal and installation of the storage battery.

3. Remove from the inlet pipeline a cover of positive contact. Disconnect a positive cable of the storage battery and compress two clips. Remove a socle down.

4. Remove the inlet pipeline from a head of cylinders. For this purpose disconnect a cable of the sensor of air temperature of pressurization (3). Address to an accompanying illustration. Disconnect a vacuum hose at the valve of a retsirkulyatsiya of the fulfilled gases (5) and at the lower part of the inlet pipeline. Unscrew bolts of fastening and remove the inlet pipeline with sealing laying (1) from a head of cylinders and from the holder. The valve of a retsirkulyatsiya of the fulfilled gases with laying (4) do not remove.


INSTALLATION

1. Fix the inlet pipeline on a head of cylinders the moment of 25 Nanometers. All laying put the new. A support of the case of the oil filter and the pipeline of a retsirkulyatsiya fix to the inlet pipeline also the moment of 25 Nanometers.

2. Fix a socle of a positive pole on the inlet pipeline and screw a shestigrannik. Put on a cover.

3. Establish covers of the engine and a pressurization pipe, address to the Section Turbokompressor.
4. Attach a negative cable of the storage battery. Establish hours. Program radio receiver stations.