E39 series BMW 5

since 1996-2001 of release

Repair and car operation



E39 BMW
+ Introduction
+ Maintenance instruction
+ Current leaving and service
+ Engine
+ Systems of cooling, heating
+ Power supply system and release
- Engine electric equipment
   - Ignition system
      Security measures at work with ignition system
      Removal and installation of the coil of ignition
      Removal and installation of the sensor of a detonation
      Check and replacement of the sensor of impulses
      Removal and installation of the tip of a spark plug
      Removal and DME control unit installation
      Spark plugs
   + System of preheat of the diesel engine
   + charge and start Systems
+ Manual transmission
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ electric equipment Schemes
+ System of onboard diagnostics


Heavy Metal & Reflected



Removal and installation of the sensor of a detonation

REMOVAL

1. Remove the inlet pipeline, address to the Section Removal and installation of the inlet pipeline.

2. Rasstykuyte shtekerny connection (1). Address to an accompanying illustration.

Arrangement of tips of cables under the inlet pipeline, looking in front:
1 — the tip of the sensor of a detonation (is closed)
2 — the pulse sensor of a cranked shaft
3 — the sensor of recognition of the cylinder

3. Turn out the detonation sensor. In the block of cylinders there are two sensors. Address to an accompanying illustration.

Do not mix sensors at installation. It can lead to engine damage. For this purpose mark accessions and position of sensors.


INSTALLATION

1. Carefully clear adjacent surfaces of the block of cylinders/sensor of a detonation.
2. Fix the detonation sensor the moment of 20 Nanometers.

Observe the inhaling moment since it is important for the correct operation of the sensor of a detonation. At installation of sensors watch purity.

3. Join shtekerny connections and fix them in holders.
4. Establish the inlet pipeline, address to the Section Removal and installation of the inlet pipeline.
5. Attach a weight cable to the storage battery. Establish hours. Program radio receiver stations.