E39 BMW + Introduction + Maintenance instruction + Current leaving and service + Engine + Systems of cooling, heating + Power supply system and release - Engine electric equipment + ignition System + System of preheat of the diesel engine - Charge and start systems Removal and installation of the storage battery The low-served storage battery Check of the storage battery Self-category of the storage battery Charging of the storage battery The generator - general information Security measures at work with the generator Check of tension of a charging of the generator Removal and generator installation Check and replacement of brushes of the generator and tension regulator Starter Removal and starter installation Removal, check and installation of the electromagnetic traction relay + Manual transmission + Automatic transmission + Coupling and power shafts + Brake system + Suspension bracket and steering + Body + Onboard electric equipment + electric equipment Schemes + System of onboard diagnostics
|
Removal and starter installation
The starter is sideways, at the plane of connection of the block of cylinders and a check point.
|
1. Disconnect a weight cable from the storage battery. The battery is located in a luggage carrier behind the right lateral facing. |
|
2. Zaizoliruyte a tape the plug of the cable going to a negative pole of the storage battery to exclude casual contact. |
3. Remove back bottom facing of an impellent compartment, address to the Section Removal and installation of the bottom guard of an impellent compartment. |
4. Disconnect the following wires: 1-plugs 30 from a positive pole of the storage battery; 2-plugs 50 from the ignition switch. |
|
| Mark laying of wires not to be mistaken at assembly. |
|
5. Turn out bolts of fastening of a starter from a check point by means of the extension piece. |
6. Take out a starter. |
|
|
1. Check a gear wheel of a drive of a starter and a gear wreath of a flywheel. Address to an accompanying illustration. |
|
2. Establish a starter and fix bolts of fastening the moment of 50 Nanometers. |
3. Fix a wire at the plug 30 the moment of 10 Nanometers, at the plug 50 the moment of 5 Nanometers. |
| Wires lay according to the marking put at a detachment. Watch that they did not fray about adjacent designs. |
|
4. Establish back bottom facing of an impellent compartment, address to the Section Removal and installation of the bottom guard of an impellent compartment. |
5. Attach a weight cable to the storage battery. Establish hours, program radio receiver stations. |
|
|
|